ETP is equipped with a membrane (MBR) facility to meet better results to meet the government prescribed parameter.
With a 400-meter cube per hour capacity, the ETP is designed to meet all future requirements of all units at Mawna.
The construction includes reverse osmosis for a zero discharge facility which will be implemented as per the government timeframe.
Eco saving attempts in processes.
Our Stenter consumes 20% less gas compared to conventional ones.
Use LED lights everywhere to save energy.
Caustic Soda Recovery plan to recover 70 to 80% of used caustic.
Heat exchangers to reutilize the heat, which saves the natural gas consumption.
Use of flue gases for co-generation of chiller through combined cooling, heat & power (CCHP) for simultaneous generation of electricity and use fume heat (500°-550°C) as a fuel to run our chiller.
Water Treatment & Harvesting Rain water.
Cogeneration
Sustainable Products
Machineries power consumption including the usage of LED lights.